probelms and how to get the green meter in pakistan

Problems to Face While Applying for the Green Meter in Pakistan

While the government is saying that they are in full support to promote net metering and solar systems still there are many difficulties for customers and solar companies who want to install green meters. Let’s discuss those problems and possible solutions in today’s article.

Problems in Net Metering Installation

  • The slow and complex process delayed the replacement of the existing meters with green ones.
  • Wapda’s slow processing takes 4 months to obtain a new connection.
  • Solar companies have a dedicated person or team that handles all the paperwork.

Lengthy Wapda Process

It’s very hard to apply for net metering after installing a solar system because all this work goes through WAPDA so it takes a lot of time. Because the old meter that is installed has to be removed and a green meter installed in its place, WAPDA approval is required for this. Unfortunately, a simple job that should be completed in 8 to 10 days, takes three to four months and if it is not properly managed then it could take more than four months.

You Scratch My Back and I Scratch Yours

To get a green meter installed, you have to deal with WAPDA, and to get the work done quickly, you have to give them some “Chai Paani”. If you don’t do that, this process can take a long time. Normally it takes three to four months, but if you comply with them, the green meter can be installed within 30 to 45 days.

Customer Payments and Solar Companies

The delay in the installation of green meters is also causing a lot of financial problems for solar companies, as customers who have installed solar panels have withheld some money from solar companies, which sometimes creates a lot of tension between the two parties. While the main responsibility lies with government officials who should get this work done smoothly and as quickly as possible.

Billing Nightmares

Delayed First Bills

After the installation of the green meter, a very big problem is the bill. Normally, the bill should come every month, but after the installation of the green meter, the same bill comes after three to four months, which creates a lot of problems.

Exclusion of Exported Units

After the installation of the green meter, when the first bill comes, it often does not include the exported units, and it becomes very difficult to get these units added. This means that if your bill is wrong once, you have to go through a lot of trouble to get it corrected. This difference along with fuel price adjustments and higher slabs creates an extra burden financially on the customer.

Meter Updates and Record Delays

Getting a green meter installed is a difficult task, and even after the installation of the green meter, citizens face many problems because it takes lots of time for the green meter to be updated in WAPDA’s records. Due to this, citizens receive their electricity bills very late and are also charged a fine.

Rectifying Billing Errors

Correcting Billing Mistakes

After the installation of the green meter, the first bill often does not include the exported unit count of the green meter. This makes it very difficult to get the bill corrected, and customers often have to make repeated trips to the electricity office. There, they are asked to “give some tea and water” to expedite the correction process.

What is the Solution to get the Green Meter in Pakistan?

There are only two ways to get a green meter installed. One is if you have a good connection in WAPDA, or the other is if you contact a solar company. Solar companies have a lot of connections, so they can get a green meter installed within a few months. However, they charge a lot of money for this service. If you can’t afford either of these options, then you just have to wait for your turn. When your turn comes, your meter will be installed.

Frequently Asked Questions

Q: Is there any other way to speed up the Net Metering process?

A: While the official process takes time, keeping in touch with government officials can sometimes help to get the paperwork done a little early.

Q: How to prevent billing discrepancies?

A: Stay in touch with the power supply companies regularly to ensure that they are taking the correct meter readings and billing calculations.

Q: What measures do solar firms take to avoid delays?

A: Solar companies can face less trouble in clearing the bureaucratic hurdles if they establish good channels with government departments and maintain a proactive approach.

latest solar panel prices in pakistan

Understanding Solar Panel Prices in Pakistan: A Comprehensive Guide (24 Jan 2024 Update

The solar panel market in Pakistan is seeing significant changes on January 24, 2024, tier 1 companies like Jinko, Myson, JA, and Longi are adjusting their rates and the A-grade solar panel prices have crossed the Rs. 44 per Watt mark. Karachi Port container clearance, continuous pre-booking trends, and the effect of a major strike also play their part in keeping the market movement agile. This blog post will give a detailed overview of the current prices, market trends, and upcoming projects in the solar panel industry of Pakistan. You can check out the latest solar panel prices here.

Key Takeaways

  • The price of A-grade, tier 1 solar panels in Pakistan is Rs. 44 per Watt today, as of January 24, 2024.
  • Myson, JA Kennedy, Zenshine, and Launch are offering the cheapest solar panels.
  • The pre-booking trends have an impact on the market, and this will give us insight into how it is impacting prices and market dynamics.
  • According to the update, Karachi Port will receive more containers on January 26. Major importers are expected to bring around 40 to 50 containers.
CompanyPanel SpecificationsRate (Rs. per Watt)
Myson540W A-grade Solar Panel44
JA565W Single Glass A-Grade Documented47
ZnShine545W Single Glass A-Grade Documented45
JA540W Double Glass BiFicial52.5
LongiLongi HiMo 6 570 & 575W Single Glass51.5
JinkoN-Type 575A-Grade Single Glass53.5
Canadian Topcon Solar575W Canadian Solar Panel53.5
Canadian650W Canadian Solar Panel53
Canadian550W Tier 1 Single Glass A-Grade Documented50
Canadian545W Single Glass A-Grade49.5
Canadian550W Single Glass A-Grade50
Trina550W Tier 1 Solar Panel51.5
Jinko550W,555W Single Glass A-Grade50
Trina550W Single Glass A-Grade50
Trina555W Single Glass A-Grade50
JA540W Single Glass A-Grade47
AKCOME730W Solar Panel60

Myson Solar Panel Rates

Myson 540W A-grade Solar Panel

  • Rate: Rs. 44 per watt

JA Solar Panel Rates

JA 565W Single Glass A-Grade Documented

  • Rate: Rs. 47 per watt

JA 540W Double Glass Bifacial

  • Rate: Rs. 52.5 per watt

Longi Solar Panel Rates

Longi 560W Single Glass A-Grade Documented

  • Rate: Rs. 51 per watt

Longi Hymo 6 570W and 575W Single Glass A-Grade Documented

  • Rate: Rs. 51.5 per watt

Jinko and Canadian Solar Panel Rates

Jinko N-Type 575A-Grade Single Glass

  • Rate: Rs. 53.5 per watt

Canadian Topcon Solar 575W

  • Rate: Rs. 53.5 per watt

Canadian Solar Panel 650W

  • Rate: Rs. 53 per watt

Canadian 550W Tier 1 Single Glass A-Grade Documented

  • Rate: Rs. 50 per watt

Canadian 545W Single Glass A-Grade

  • Rate: Rs. 49.5 per watt

Canadian 550W Single Glass A-Grade

  • Rate: Rs. 50 per watt

Other Solar Panel Rates

Trina 550W Tier 1 Solar Panel

  • Rate: Rs. 51.5 per watt

Trina 550W Single Glass A-Grade

  • Rate: Rs. 50 per watt

Trina 555W Single Glass A-Grade

  • Rate: Rs. 50 per watt

JA 540W Single Glass A-Grade

  • Rate: Rs. 47 per watt

Solar Market Trends

  • Impact of Boycott: The effect of the boycott is on prices, many companies slashed their rates as well.
  • Upcoming Containers: More containers will come on the 2nd and 5th of February, which will also play a vital role in market dynamics.

Frequently Asked Questions

Q: What is the impact of the boycott on solar prices?

  • A: Because of the boycott, prices are being impacted positively some companies have reduced their prices.

Q: What is the current situation of container clearance at Karachi Port?

  • A: As of the 24th of January, 320 containers have been cleared and more are expected on January 26.

Q: Are any changes in solar panel rates expected soon?

  • A: The market is dynamic, changes are supposed to come according to container arrivals and demand.
On-grid or Hybrid System - Which is Better in Pakistan

On-grid or Hybrid System – Which is Better in Pakistan?

On-Grid or Hybrid Systems (Main Points)

  • On-Grid System: A system without a battery, that depends on net metering and fails in case of load shedding.
  • Hybrid System: It combines the characteristics of on-grid and off-grid, so you can enjoy savings as well as luxury during the load-shedding period.
  • Recent Changes: Switch from an on-grid system to a hybrid one because of the increased load-shedding and changes in energy dynamics.
  • Recommendation: In the current situation, it is better to go with a hybrid system, due to its versatility although capital cost will be on the higher side.

Understanding On-Grid and Hybrid Systems in Pakistan

On-Grid System (Battery-less System)

In an on-grid system, solar energy is produced without batteries. Solar energy is injected into the house without storage, and extra energy is sent back to the grid via a green meter. This system is cost-effective and long-lasting but does not work during load shedding.

Hybrid System (Combining On-Grid and Off-Grid Features)

Just like the On-grid system, a hybrid system also uses net metering but a hybrid system has an edge of working in load shedding as well. This is possible by adding batteries to the system to still provide electricity even if the grid is off.

Evolving Trends in Pakistan’s Solar Energy Landscape

Past Trends

A few years back, people were using the on-grid system because of its lower price, longer life, and more efficiency. In the old days when load shedding was less frequent and people’s first choice was on-grid solar systems.

Shift in Dynamics (2022 Onwards)

In 2022, energy dynamics changed in Pakistan due to the increased load shedding because On-grid systems were unable to provide electricity during load shedding where they were supposed to perform so this shift forced many people to move with the hybrid system or add a hybrid inverters with their existing on-grid setup.

Load Shedding Challenges

In heavy load shedding, on-grid systems are unable to contribute to the grid resulting in the wastage of energy they generate. At this time, hybrid systems are a good choice because they can operate during load shedding.

Choosing the Right System for Pakistan’s Environment

Why Hybrid System is Recommended in the Current Scenario

Looking at the current energy situation and the possibility of ongoing load shedding, a hybrid system is our recommendation. A hybrid system ensures that during load shedding there should be no interruption in power supply. It can save you money along with luxury.

Optimizing Solar System Size for Cost-Efficiency and Backup

While determining the size of your solar energy system, make sure to keep a balance to ensure continuous power supply and cost-effectiveness in load shedding. For a powerful and cost-effective solution, follow these guidelines:

System Size Recommendations:

  1. 20 kW System:
    • Assign 5 kW for Hybrid and 15 kW for On-Grid.
    • Benefit: Reduces the cost and capital expenditures.
    • Advantage: Provides 5 kW backup during hybrid operation.
  2. 10 kW System:
    • Choose Hybrid System.
    • Reasoning: A hybrid system is a good option because it can work during load shedding, so you will get a continuous supply of electricity.
  3. 5 kW System:
    • Choose a Hybrid System.
    • Importance: Ensures that all limited loads in your house continue running during load shedding, both day and night.

Budget Considerations

It should be noted that the capital cost of a hybrid system is higher it will be around 1.5 times more than the on-grid system. But if there are no budget constraints, then the additional benefits make it a good investment.

Frequently Asked Questions

Q1: What is the main benefit of a hybrid system as compared to an on-grid system?

A: The biggest benefit of the hybrid system is that it can work during load shedding to provide a continuous power supply.

Q2: Will I be able to save money with the on-grid system?

A: Yes, the on-grid system is budget-friendly and it will save money on the electricity bills but it doesn’t work during load shedding.

Q3: Is it beneficial to invest more money in a hybrid system?

A: A hybrid system has an initially high cost but as it provides energy during load shedding and ensures uninterrupted power supply it is worth the investment.